Construction on several streets in the Coteau district in Deux-Montagnes

Construction on several streets in the coteau district in Deux-Montagnes

The City of Deux-Montagnes announced that roadway repair work and construction of new curbs of streets will be carried out on several streets in the Du Coteau district during the summer. Work begun on Monday June 21 and will end on August 13. This work will be carried out from Monday to Friday between 7 am and 5:30 pm

 

Take a look at the
featured Local Savings
at the bottom of this page!

The work to be carried out is aimed at improving the asphalt pavement and repairing existing street edges or the construction of new edges. The streets targeted by this work are: Larouche, Brunette, Olympia, Place Filiatrault, Place du Coteau,Gamble (the part not completed last summer), Bernard, Lepage, Baudoin, Kennedy and Du Berger

• During the work, only local traffic will be authorized. Road traffic will be maintained at all times, but restricted in both directions.

• On- street parking is prohibited between 7 am and 6 pm throughout the work.

• Residents who have a buried sprinkler system are asked to contact the city to indicate the location of the sprinkler heads located near the street limit and in the intervention strip of the repair work.

Outdoor fires authorized again

The ban on open fires has now been lifted. From now on, residents will be able to use any outdoor fireplace equipped with a fire screen, a fireplace and a sturdy cover.

Note that only dry wood can be used in the fireplace. In addition, the smoke should not harm the neighbors. It is the user’s responsibility to avoid any harm to their neighbors.